Gantt ​

Bars on a time axis, draggable, with dependencies

A schedule drawn as bars: what runs when, what overlaps, how far each task has got. For events in order without durations, use Timeline. For tasks that move between states, Kanban.

Basic
Plan the release
Build the components
Write the docs
End-to-end pass
Publish
click a bar, or use the arrow keys and Enter
  • tasks is [{ id, label, start, end, progress? }] with ISO dates (2026-10-05). A task covers both its first and last day, so start equal to end is a one-day bar. progress (0 to 100) fills the bar with ink.
  • The axis spans the tasks, and today if it is earlier. from and to fix it, and tasks outside are clipped. dayWidth is the zoom: below 12 px the day numbers are left out and only months show. Weekends are shaded and today has an accent line.
  • The label column stays put while the chart scrolls sideways. locale sets the month and date names.
  • Each bar is a button with its dates and progress as its name ("Build: Oct 4 to Oct 10, 60% done"). One tab stop. ↑ ↓ move between bars, Home and End jump, Enter or a click selects. v-model:selected holds the chosen id (the accent marks it) and select fires with the task.
  • after: [id, …] on a task draws an elbow arrow from the end of each task that it waits for to its start. The name of the bar says it ("Build: Oct 4 to Oct 10, after Design"). Unknown ids are ignored. The arrows follow a bar while you drag it.
  • editable makes it a planner. Drag a bar to move it, or its left or right edge to resize it, in whole days. The bar follows the pointer and the change is committed when you let go. An end cannot cross the other, so a task is always at least one day. From the keyboard, Alt + ← → moves the focused task a day and Alt + Shift + ← → moves its end. Each change is announced ("Build: Oct 5 to Oct 11").
  • v-model:tasks carries the edits (new objects, dates as ISO strings), and change(task, { start, end }) fires per edit, so you can save it. Without editable nothing can be changed and the grips are not drawn.
  • Moving a task past the edge of the chart widens the axis when from and to are not fixed. With them fixed, the bar is clipped.

Usage ​

ts
import { BlessGantt } from "blessing-ui";

API ​

Props

NameTypeDefaultDescription
dayWidthnumber28width of one day in px; under 12 the day numbers are left out
rowHeightnumber36
fromstring—first and last day shown; defaults to the span of the tasks
tostring—
localestring—
labelWidthnumber160width of the label column in px
editableboolean—drag a bar to move it and its ends to resize it; Alt + arrows from the keyboard
labelstring"Schedule"
labelsPartial<{ span: (task: string, from: string, to: string) => string; done: (percent: number) => string; after: (names: string[]) => string; }>—the sentence read for a bar and the one announced after an edit; dates arrive formatted
tasks*BlessGanttTask[]—the schedule; with `editable`, moves and resizes come back through here
selectedstring | number | nullnull

Events

NamePayloadDescription
select[task: BlessGanttTask]
update:selected[value: string | number | null]
change[task: BlessGanttTask, dates: { start: string; end: string; }]
update:tasks[value: BlessGanttTask[]]